| ||||
|
'The Box' - Merkur Spiel-Arena Duesseldorf I Germany
Scope of services
Concept idea and design of 'The Box' as an extention of the existing event spaces of the Arena Duesseldorf, creating a new ground floor entrance for the
main stand, sustainable longterm multiple event use, e. g. as press conference center for the UEFA EURO 2024,
wood-hybrid construction and provision of PV on roof area respecting eco efficiency, including redesign of
belonging existing inside spaces of the Arena – Stage 3 design in 2020/21
Project information
Capacity: 1.400 people
Building costs ca.: 6,5 M Euro
Completion: 2023
Client: D.Live GmbH & Co. KG